The words behind the record.

Decision Intelligence

Glossary

Plain definitions for Memolok's vocabulary and the industry terms it builds on, in the order a decision lives them: what it starts from, the moment it is made, and what happens after.

Jump to a term:

The Record at a Glance

A Memolok Decision Record drawn as a fish: the head is the need, the belly the alternatives, the waist the verdict, the tail the expected outcomes, with open questions drawn as a dashed shape inside the tail; world facts sit outside the fish, linked to the belly; and the wake trailing behind is what actually happens

A matter is raised and sharpened into a need, the head of the fish. The team weighs alternatives against world facts from the world almanac, then commits a verdict at t₀, together with its expected outcomes. From that moment the decision can act on the world, and the MDR is sealed in its MDL. What happens next is the wake: observed outcomes, compared with what was expected, give the learning delta. When the team changes its mind, a new record supersedes the old one, or amends the part that changed, and the old one stays on the ledger.

The Record

The record itself, how it is sealed, and how it changes.

Memolok Decision Record (MDR)

Memolok's structured record of a single decision, sealed once it is committed: the need, the world facts it rests on, the alternatives and what ruled them out, the verdict, the expected outcomes, and the open questions it deliberately leaves unsettled. Read more about the MDR.

Memolok Decision Ledger (MDL)

The collection of Memolok Decision Records for one line of reasoning: a person, a team, a project, or a company's leadership. It also holds the world facts, matters, and observed outcomes around those records. An organization keeps as many MDLs as it needs. One ledger can build on another's decision by taking it in as a world fact, a premise its own decisions rest on. Read more about the MDL, and why we built it for one person and for the whole company.

Fish

The shape of a Memolok Decision Record: the head is the need, the belly is the deliberation over alternatives, the waist is the verdict, and the tail is the expected outcomes. Why we record every decision in the same shape.

t₀

The moment a decision is committed, as Accepted or Rejected. From t₀ an accepted decision can act on the world, and its reasoning and expected outcomes are sealed; everything that happens afterward belongs to the wake. A rejected decision is sealed at its own t₀, as the formal choice not to take that path. Read more about t₀.

Sealed

A record committed at t₀, as Accepted or Rejected. Its need, alternatives, verdict, expected outcomes, open questions, and who decided and who wrote it up no longer change. Until something relies on it, someone with the right access can uncommit it back to drafting, in plain view on the ledger; once something does, it is final, and a change of mind takes a new record that supersedes or amends it. See t₀.

Status

Where a Memolok Decision Record stands, visible on every record so people and AI agents can tell what is current without opening it.

  • New: the need is set, and deliberation has not started yet.
  • Deliberating: the alternatives are being weighed against the world facts.
  • Proposed: a candidate choice and a drafted verdict, waiting for someone to commit.
  • Accepted: sealed at t₀ and in force.
  • Rejected: sealed at t₀ as a path not taken, so it can be found if the idea comes back.
  • Superseded: an accepted record replaced by a later one, and still on the ledger.

New, Deliberating and Proposed records are still being drafted: anyone working on the ledger can improve them, and they carry no ledger number until t₀.

See t₀.

Supersession

What happens to a decision when thinking changes. A later record supersedes the accepted one, and both stay on the ledger, each honest about the moment it was made, so "is this still the decision?" has an answer on the record. Why we built it this way.

Amendment

A new record that changes one part of an accepted decision while the rest stays in force, such as a narrower scope or a corrected commitment. Both stay on the ledger, and the original shows what amended it. See supersession for replacing a decision whole.

Decision Transaction Principle

A decision is an event, posted to the ledger at t₀ like a transaction. A posted entry is never rewritten to look wiser later; a correction is a new, dated entry. Why we built it this way.

Thin decision

A real decision, sealed as Accepted or Rejected, with the bare minimum behind it: one option considered, little or no argument recorded. Still a genuine commitment with a verdict on record, not to be confused with a phantom decision, which was never decided at all. Why we accept thin decisions.

Scratchpad

A disposable working note inside a Memolok Decision Ledger: a pasted quote, a scraped page, rough numbers, an idea that may go nowhere. Unlike an MDR or a world fact, a scratchpad makes no promise and can be rewritten or deleted at any time.

Before the Decision

What a decision starts from: the question raised, the need, the options, and the facts it rests on.

Matter

Something raised for possible decision work, in the raiser's own words: a problem, an idea, an opportunity, a mandate, or a concern ("I can't log in", "login takes forever"). A matter can be parked on the ledger with nothing decided yet, and picked up later. It may lead to one or more Memolok Decision Records, or be closed without one. See how Memolok works.

Need

What has to be true for a decision to succeed, expressed in the business domain and stated sharply enough to be tested afterward: "process login requests in under 50ms," not "login takes forever" or a vague goal like "improve performance." The head of the fish.

Alternative

An option that was on the table before a decision was made, including the ones ruled out. A Memolok Decision Record keeps the alternatives and the reason each one lost, so when a rejected idea comes back, the reasons it lost the first time are still there. Why we require alternatives.

World fact

Anything taken as true outside the decision itself, regardless of any particular choice: a budget, a contract term, a regulation, a client's requirement, what the team knows how to do, a natural event such as a storm season, even another team's decision. World facts are the premises a decision rests on, the boundaries of what is possible, not arguments for or against an option. Decisions reference world facts from the ledger's world almanac rather than repeating them, so when a fact changes, every decision that referenced it can be found. Part of the world almanac; why we keep facts apart from decisions.

World almanac

The collection of world facts a Memolok Decision Ledger has admitted: the budgets, regulations, team knowledge, and other outside-the-decision truths its records rely on. Keeping these separate from the decisions themselves lets Memolok flag every record that references a fact later found to be wrong, a check that is decided, on our roadmap. Read more about the world almanac.

Premise

What a decision rests on. In Memolok, premises are kept as world facts in the world almanac, so when one turns out to be wrong, every decision that references it can be found. See world fact.

Ledger Intent

A short, freely revisable statement of what a Memolok Decision Ledger is for: its purpose, its audience, and the rough direction it is heading. It orients the next decision rather than governing it; a sealed Memolok Decision Record never leans on it to justify itself, so updating the intent never rewrites the past.

Chain of agency

Who did what on a decision: who raised it, who framed the need, who wrote it up, and who committed. A Memolok record names who wrote it up and who committed, so nobody has to rely on a git blame or someone's memory; the full chain, from who raised the question to who was consulted and informed, is coming soon. Why the AI drafts and a person approves.

The Decision

The moment of commitment and what it promises.

Verdict

The decider's commitment and the judgment behind it, for example "we accept the extra operational work of X because the throughput gains are non-negotiable." It closes the deliberation; the options ruled out and the reasons they lost sit beside it in the record. The waist of the fish.

Expected outcome

What a decider expects to follow from a decision: the hoped-for results, and also the costs, the risks, and the work it sets in motion ("we expect to hire two specialists" belongs here too). It is written down at the moment of commitment, so it can later be checked against what happens. Read more about the expected outcome, and why we require one.

Open question

Something a decision deliberately left unsettled, recorded as its own item rather than lost in prose, so a later reader can tell a choice from an oversight. See how Memolok works.

After the Decision

What happens once the record is sealed, and how it is checked against what was expected.

Wake

Everything that happens in the world after a decision is committed. A Memolok Decision Record is sealed at the moment of the decision, so what follows, including whether it worked, is recorded separately, as one or more observed outcomes linked back to the record they report on. Read more about the wake.

Observed outcome

What actually happened after a decision, recorded and linked back to the record it reports on, so it can be compared with the expected outcome. Part of the wake; why we record it separately.

Discovery type

How Memolok classifies an observed outcome by whether it was foreseen when the decision was made. See how Memolok works.

  • Expected: assesses something the decision already committed to, and comes back satisfied, violated, or inconclusive.
  • Emergent: a result nobody could have reasonably predicted.
  • Deducible: a result nobody logged in advance, but that could have been reasonably foreseen.

Learning delta

The gap between what a decision expected to happen and what actually happened. One miss is a data point; a pattern of misses across many decisions is a signal worth raising at a strategic level, not only in a retrospective. Part of the wake.

Polluted premise

The flag Memolok raises (decided, on our roadmap) on a decision that referenced a fact later found to have been wrong when it was admitted. It does not mean the decision was wrong, since the choice was reasonable given what was known at the time, only that its foundation was never sound and is worth a second look. Part of the world almanac.

What Decision Debt Looks Like

The cost of decisions nobody recorded, and the five ways it shows up.

Decision debt

The compounding cost of choices that were made, often carefully, and never recorded. It is often behind the more familiar meaning of the phrase too, the hard calls that never get made, since those can stall for lack of anything earlier to stand on. See decision debt.

Cargo-culting

One of the five ways decision debt costs an organization. A choice gets copied forward into the next project because it is already there, not because anyone checked it still fits, since its original justification is unavailable. See decision debt.

Decision decay

One of the five ways decision debt costs an organization. The world a choice was made for changes, and because no premise was recorded, nothing flags that the choice has quietly stopped being right. See decision debt.

Paralysis

One of the five ways decision debt costs an organization. Nobody will touch a decision because nobody knows what it was load-bearing for, so the safest available action is to build around it. See decision debt.

Phantom decision

One of the five ways decision debt costs an organization. An issue that was never decided but that everyone treats as settled, with no verdict to look up because none was ever reached. See decision debt.

Zombie decision

One of the five ways decision debt costs an organization. A decision that was made, with alternatives explicitly ruled out for explicit reasons, comes back years later and gets re-litigated from scratch by people with no access to the original reasoning. See decision debt.

The Wider Field

Industry terms Memolok builds on, and where the Decision Record sits among them.

Decision record

A written account of one decision: what was decided, what else was considered, what was known at the time, and what the decider expected to happen as a result. It applies to any decision a person, a team, or an AI agent will later need the reasons for. See the Product page, or start with the free Decision Record template.

Decision Record platform

Software built to capture, keep, and serve decision records, so the reasoning behind a choice can be found and trusted long after it was made. Memolok is the Decision Record platform for every kind of decision, readable by the people and the AI agents who rely on it. See how to choose a Decision Record platform.

Architecture decision record (ADR)

A software team's one file, one decision convention: usually a short Markdown file with a title, a status, the context, the decision, and its consequences, committed alongside the code. Teams that adapt the format for business choices call it a business decision record. Memolok applies the same discipline to every decision, technical or not; in an ADR, the status is a line of text in the file, and the common templates have no field for a measurable expected outcome. See what you use today.

Business decision record (BDR)

An architecture decision record adapted for business choices such as pricing, hiring, suppliers, or entering a market. It keeps the ADR shape and usually adds an owner, the people consulted, a success measure, and a review date. A Memolok Decision Record covers the same ground for any kind of decision, with a status you can query, expected outcomes checked against what happened, and supersession instead of edits. See what you use today.

Product decision record (PDR)

An architecture decision record adapted for product choices, such as which feature to build, how to price a tier, or what to cut from a release. Some teams keep architecture, product, and business decision records as three separate formats; a Memolok Decision Record uses one structure for all three. See what you use today.

Decision Intelligence

The discipline of improving how an organization decides, and how it learns from what happened next. Its tools support, augment, or automate decisions; the Decision Record is the foundation underneath, keeping what was decided and why, whichever way the decision was made. See the Decision Intelligence hub.

Decision Support

One of the three ways Decision Intelligence decides: the person decides. Dashboards, scenario models, and analytics platforms that hand a decision-maker data about the world outside, such as the market, operations, or customers. It informs the next decision, while the Decision Record keeps the reasoning behind the ones already made. See the Decision Intelligence hub.

Decision Augmentation

One of the three ways Decision Intelligence decides: the person and the machine decide together. A system recommends a course of action, and a person approves, adjusts, or overrules it. See the Decision Intelligence hub.

Decision Automation

One of the three ways Decision Intelligence decides: the machine decides. Rules engines, ML models, and workflow systems that make decisions on behalf of the organization, such as credit scoring, fraud detection, or dynamic pricing. See the Decision Intelligence hub.

Context engineering

The practice of giving AI agents the right information at the right time, and only what they need, so they act the way your organization intends: their instructions, the tools they can call, examples of the behavior you want, the conversation so far, what they retrieve, and what they write down for later. A Memolok Decision Record is part of its governance layer. See Context Engineering.

Governance

Accountability for the rules a system follows: the policies, the permissions, the logs that show a rule ran, and the reasons behind each rule. A Memolok Decision Record is the part of governance that holds why a rule exists; enforcing the rule stays with the system that runs it. See Context Engineering.

Model Context Protocol (MCP)

The open protocol Memolok's plugin uses to read and write a Memolok Decision Ledger directly inside Claude Code, Claude chat, and Cowork, through a tool interface rather than by scraping pages. See decision records for AI agents, and why we serve decisions over MCP.

Read More

Decisions live here.